THE CONSTRUCTION OF A COAL DEPOSIT AND BIOMASS BRICK PLANT
EnergyThe project objective is to set up an industrial coal and biomass brick factory in Tchirozerine, with an annual capacity of 50,000 tons. This project is part of the national strategy for the…
Read moreTHE HYBRIDISATION OF THE DIFFA DIESEL PLANT
EnergyThe project for the hybridisation of the Diffa diesel plant is part of the Niger government’s energy policy to achieve energy autonomy by increasing the country’s energy capacity…
Read moreTHE CONSTRUCTION OF A SOLAR PHOTOVOLTAIC PLANT AS AN AUXILLARY OF THE SONICHAR 2 × 25 MW PLANT
EnergyThe project is for the construction of a solar photovoltaic park in the Far North of Niger, with a production capacity of 50 MW. This plant would be in line with the national strategy for…
Read moreCONSTRUCTION OF A SOLAR STREET LAMP PRODUCTION AND INSTALLATION PLANT
EnergyIn Niger, there are huge discrepancies between different areas for access to modern energy services. In fact, according to the National Statistics Institute, the rural electrification rate is 0.27…
Read moreTEACHER AND RURAL HEALTH AGENT KITS
EnergyA high teacher and nurse absentee rate and drop-out rate is observed in rural areas, as they always prefer to work in better living conditions (urban and semi-urban centres); the consequences are…
Read moreTHE CONSTRUCTION OF A HYBRID THERMAL/SOLAR 60 MW POWER PLANT
EnergyThe project for the construction of a hybrid thermal/solar power plant with a production capacity of 60MW in Soraz aims to reduce the recurrent electric power deficit in central-East Niger (Zinder…
Read moreSOLAR ELECTRIFICATION OF STRATEGIC AND SENSITIVE BUILDINGS
EnergyNiger possesses important fossil fuel and renewable energy resources that are capable of meeting it’s populations’ present and future power needs. Despite this high potential, the energy sector is…
Read moreENERGY MIX THROUGH THE INSTALLATION OF CONCENTRATED SOLAR POWER PLANTS
EnergyTo meet the electric power production deficit challenge, solar energy plants remain an important and feasible option, in view of Niger’s geographic location, benefiting from 365 days of sun per…
Read moreTHE CONSTRUCTION OF THE 132 KV MALBAZA – KIETA – TAHOUA POWER LINE, LENGTH 144 KM
EnergyThe project is part of the Niger government’s policy to increase the country’s energy capacity in order to achieve energy autonomy.
Read moreTHE CONSTRUCTION OF 4 SOLAR PHOTOVOLTAIC PLANTS
EnergyThe project for the construction of four solar photovoltaic plants, each with a capacity of 10 MW, in the Maradi and Dosso, regions, aims
Read more